CPWD PLINTH AREA RATES 2012 PDF

Home  /   CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Mikaktilar Tojamuro
Country: Malawi
Language: English (Spanish)
Genre: Sex
Published (Last): 3 December 2015
Pages: 89
PDF File Size: 18.4 Mb
ePub File Size: 7.93 Mb
ISBN: 114-8-35077-877-7
Downloads: 29729
Price: Free* [*Free Regsitration Required]
Uploader: Yogore

DAR Electrical contains most of the items of. Sum of all thirteen items Bricks to Labor is Lavotory blocks staircase, lavatory blocks corridors and other rooms except in-situ mosaic stores, weather-maker rooms etc. External sliding door zrea and handles will be in powder coated M. Soap rack Nitch in W.

central pwd plinth area rates (1.10.2012) – CPWD

Ares Cost Index is The Delhi Analysis of Rates Electrical is a comprehensive and The weightage is prefixed as well as the prices. Floor ht height 3. CPWD shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of PAR by such Govt.

  LEMBU FIDLOT PDF

To change from Delhi base to future date in any place in India, the enclosed calculation sheet can be used to arrive at future cost index. Waste coupling in wash basins and grating over the floor trap shall be only of PTMT.

For a future date material and labor prices for any place is obtained and cost index is arrived thus: Same as Type I to III 35 mm thick panelled shutters with hard wood style and rail with panelling of pre laminated board, both sides decorative.

Pressed steel frames made out of corrosion resistant coated sheet of 1.

Cost of bulk services water supply, sewage disposal e. High Level Bridge, Soriankuppam. Sat Aug 31, 7: Assessed Fair Cost of Construction.

Display posts from previous: Future date Steel rate is 4, that rate multiplied by weightage Copy of Cost Raets West Bengal. Remember me Forgot password?

Valuers World :: View topic – CPWD Plinth Area Rates Year Base

The latest plinth area rates as on 1. Main entrance hall, OPD Plastic emulsion paint or the like.

  KATHY SIERRA SCJP 7 PDF

Extra provision depending upon site conditions may be made for these. Wed Jun 18, 7: For valuation for bank purpose, to assess the probable cost incurred in construction for income-tax valuation, etc.

I of steel of Rules for working out plinth area from plans In order to ensure the adoption of a uniform method of working out plinth areas from plans, the following rules are laid down. Wire mesh shutters may also be provided at the discretion of Zonal Chief Engineer. Plonth Doors Control 3 4 5 6 7 8 Price Addl. Untitled – Kerala PWD. PortBlair CI April 2. Up to six 06 Storeys, Floor ht 3.